Fresh Electrical 2.58kW Solar PV System [6 Panels] - Fully Installed
Fresh Electrical 2.58kW Solar PV System [6 Panels] - Fully Installed
Fresh Electrical 2.58kW Solar PV System [6 Panels] - Fully Installed
Fresh Electrical 2.58kW Solar PV System [6 Panels] - Fully Installed
Fresh Electrical 2.58kW Solar PV System [6 Panels] - Fully Installed

Fresh Electrical 2.58kW Solar PV System [6 Panels] - Fully Installed

SKU: 5684677

Fresh Electrical 2.58kW Solar PV System [6 Panels] - Fully Installed

SKU: 5684677
Precio habitual £4,599.99
/
  • Free UK Mainland Delivery & Returns
  • Ship From UK
  • Carbon neutral
  • Secure payments
  • En stock
  • Pedido pendiente, envío pronto
Impuesto incluido. Los gastos de envío se calculan en la pantalla de pagos.

Energy prices are high, and there is ever growing worry of global warming, meaning there’s no better time to install solar power.

With a Fresh Electrical solar system, you will receive a full solar panel design specific to your building’s roof, along with a complete report on your specific system. All systems are installed by a fully qualified engineer then commissioned and tested by the electrical team to ensure it is MCS (Microgeneration Certification Scheme) compliant. Once complete you’ll receive a handover pack with manuals, warranty information and maintenance advice.

Fresh Electrical Solar are covered by HIES, the Home Insulation and Energy Systems Quality Assured Contractors Scheme, a strict accreditation process that ensures high-quality is always maintained.

What is a solar PV system?

Solar panel electricity systems, are also known as photovoltaics (PV), capture the suns energy using photovoltaic cells. These cells don’t need direct sunlight to work – they can still generate electricity on a cloudy day. The cells convert the sunlight into electricity, which can be used to run household appliances, lighting and EV chargers.

Benefits

System components

Euerener 430w solar panels

Fox ESS AC inverter

Fox ESS PV monitoring system

The Fox Cloud monitoring system allows you to view your system performance and generation using a mobile app. You can also use the web-based monitoring for more in depth data on your system, generation and performance. This allows you to receive and monitor in real time the data of your solar system on your smartphone or computer from anywhere.

Bird netting serves as a protective barrier for solar panels, preventing birds and other wildlife from nesting or roosting underneath them.

By installing bird netting, you safeguard your solar panel array against potential damage caused by nesting materials, bird droppings, or pecking, which could compromise the panels' efficiency and lifespan.

This netting acts as a deterrent, ensuring the panels remain clear of obstructions and maintaining their optimal performance while also minimizing maintenance needs.

What’s included?

ORDERING PROCESS

1) Order your solar panel system based on the recommended package size for your building generated by the Solar Panel Configurator

2) You will be contacted by Fresh Solar to confirm your property address, request a copy of a recent energy bill

3)  A qualified surveyor will attend your property to complete a technical survey within 10 business days upon receiving the above information

4) Once the survey is completed, the information will be passed to our design team who will create a bespoke solar PV design for your property within 10 days of completion of the technical survey. Any additional costs will be discussed and agreed at this stage

5) If a revision to the order is required Fresh Solar will advise on which system would be best suited to your property to order. You have the option to cancel your order or re-order the correct solar package

6) Once the correct size system and design are confirmed alongside any additional costs (if required), an installation date will be booked within 30 business days upon acceptance of the design. If the system is above 3.68kW an application will be made to the relevant Distribution Network Operator for connection. Please note; in some instances this can take up to 60 business days and will therefore delay installation until acceptance has been received

7) Where necessary scaffolding will be erected prior to the installation

8) Installation of the panel mounting system and panels will be completed, the inverter and battery (if applicable) will be installed by MCS qualified electricians, the system will be commissioned and tested by the electrical team once installation is complete

9) A handover pack will be prepared and issued within 14 business days of commissioning

The contract will only be concluded after the survey has been completed and the member confirms they wish to proceed by signing the contract with Fresh Electrical. The contract for supply and installation of the solar panels is with Fresh Electrical, not Costco. Costco will take the payment from the member and the full funds will be held in a ‘ring-fenced’ account until a job completion form is signed by the member. Costco will only receive a commission paid by Fresh Electrical Solar.

    • Lead Days Breakdown
    • Fox ESS Datasheet
    • Eurener are a world leading manufacturer of high efficiency, mono crystalline solar cells
    • Sleek appearance with black frame
    • High module conversion efficiency – up to 22%
    • Inclusive 25-year product warranty and 30-year linear performance warranty
    • Innovative TopCon technology – to increase cell efficiency
    • Compact slim design with LCD display
    • IP65 water and dust resistant
    • 10-year warranty
    • A complete report on your specific system
    • Full design specific to your building’s roof
    • Specialist rail mounting system which suits your type of roof tile
    • Complete installation service with MCS commissioning Panels installed on a maximum of 2 roof elevations Central location of all hardware Inclusion of external wiring and ducting from solar panels connection point/meter Scaffold provision for a maximum of one elevation Maximum scaffold height of 2 storeys Access must be freely available to all areas required for installation, plus connection to existing wi-fi network
    • Panels installed on a maximum of 2 roof elevations
    • Central location of all hardware
    • Inclusion of external wiring and ducting from solar panels connection point/meter
    • Scaffold provision for a maximum of one elevation
    • Maximum scaffold height of 2 storeys
    • Access must be freely available to all areas required for installation, plus connection to existing wi-fi network
    • A handover pack with manuals, warranty information and maintenance advice
    • Installation warranty to cover any issue post installation
    • Please refer to Standard Installation and Surcharges sheet for reference and potential extra costs

Reduce your electricity bills Sunlight is free and readily available, so once you’ve paid for the initial installation your electricity costs will be reduced. You will receive a tailored report by Fresh Electrical Solar highlighting your potential savings upon site survey.
Cut your carbon footprint Solar electricity is a green, renewable energy source and doesn’t release any harmful carbon dioxide or other pollutants. A typical home solar PV system could save over a tonne of carbon dioxide per year.

Este sitio está protegido por reCAPTCHA y se aplican la Política de privacidad de Google y los Términos del servicio.

Visto recientemente